Incitec Pivot – Roof Refurbishment

Incitec
Project Overview
  • Provide access to roof for blast and paint repairs
  • Inside an active fertilizer plant
  • Scaffold designed to provide as much access under scaffold as possible

We were contacted to provide access for a full roof refurbishment at an active fertilizer plant. The access to the roof was required for blast and paint repairs.The key point to winning this project, was designing the scaffolding access so operations could continue for the plant. Shutting the plant down would have costed the company hundreds and thousands of dollars inlost revenue.Our goal from the outset was to provide as much room as possible under the scaffolding so operations didn’t have to be disrupted. Using the Layher Allround Scaffolding System provided the necessary capa­ bilities to satisfy our clients’ needs and continue operations safely. Using our in-house design and engineering team that is experi­ enced in these projects allowed us to complete the job on time and under budget.

Share this Case Study
Unnamed (4)
Subscribe
Did you enjoy this article? Subscribe for more!
Get A Quote

Share This

Select your desired option below to share a direct link to this page